söndag 28 februari 2016

Air business (luftaffärer)

A couple of years back I got myself a rather cheap kompressor plus airbrush. It has served me well but the time has come to upgrade since weathering is a big interest for me and also the procedure that turns a plastic toy into a model.

The package consist of Iwata Smart Jet Compressor, Iwata Hi-line CH (HP-CH) aribrush and Pistol Grip Moisture Filter.

I better control myself otherwise there will be very little without some kind of color in my hobby room.




söndag 21 februari 2016

More turnouts

Five out of eight skeletons for right turn switches now ready, three more to go. And then four left turn before the wooden tiles can be added.

Fun


lördag 20 februari 2016

Running out of turnouts

Sorry about the mess.
In the middle of the creative phase I run out of turnouts. 8 right turn and 4 left is now needed for the switching area, including the brewery, so there was no alternative to start the production.

Well, that is also part of the hobby and also a fun procedure. It has been a while since I did it so it took some practice to get it right.

söndag 14 februari 2016

Mainline at the final stage

The building speed is now extremely high and I am soon ready for a test run on the mainline. Well that might be an exaggeration but the tracks and turnouts are more or less in place.

First turnout after Clarion Yard (module). It could have been nice with a #10 or #12 but home layouts lack space so one have to do compromises.
The empty cork to the right is only 1mm thick and should host C40 handlaid track for the drill track. 

Hand made turnouts. A bit more complicated than the ones from the factory but in my humble opinion they look better (once painted)

fredag 5 februari 2016

Electrical work in progress



Red, black and white cables are soldered onto the tracks and switch engines. Bit by bit the layout is getting electrified. Sure, it has to be connected to power and tested but soon it will be ready for trains.

Soldering in progress

Lots of cables

Almost invisible connections to track