fredag 5 februari 2016

Electrical work in progress



Red, black and white cables are soldered onto the tracks and switch engines. Bit by bit the layout is getting electrified. Sure, it has to be connected to power and tested but soon it will be ready for trains.

Soldering in progress

Lots of cables

Almost invisible connections to track

1 kommentar: